BillsHH.R. 10579
To amend the Federal Power Act to require the Federal Energy Regulatory Commission to issue a final rule relating to the interconnection of large load facilities with the transmission system, and for other purposes.
Stage
In committee
Latest action
Referred to the Committee on Energy and Commerce, and in addition to the Committee on Science, Space, and Technology, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.
September 24, 2026
Committees
- PrimaryScience, Space, and Technology Committee
- AlsoEnergy and Commerce Committee
Action history
- September 24, 2026Introduced in House
- September 24, 2026Introduced in House
- September 24, 2026Referred to the Committee on Energy and Commerce, and in addition to the Committee on Science, Space, and Technology, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.
- September 24, 2026Referred to the Committee on Energy and Commerce, and in addition to the Committee on Science, Space, and Technology, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.